GE Aviation Expects its CF34 engine to double in 10 years
With more than 4,000 CF34 engines powering regional aircraft, GE Aviation expects the engine fleet to exceed 8,600 by 2018 - based on the strong demand being forecast for GE-powered regional aircraft.

In 2008, GE will deliver nearly 500 CF34 engines for regional aircraft, with the delivery rate growing more than 20% annually. Based on today’s order book, CF34 deliveries for regional aircraft will exceed 700 engines in 2010.

CF34 engines power regional aircraft in the 50-to-120-passenger range, with an airline customer base that has grown from 24 airlines to 82 airlines in seven years.

“The growing CF34 installed base in service fuels our aggressive technology investments to further enhance this fleet’s high reliability and low operating costs,” said Chuck Nugent, general manager for CF34 programs. “GE is not taking its leadership role in regional aircraft for granted.”

GE has already invested more than $2 billion in development programs to establish its CF34 engine family, comprised of 6 basic engine models and 13 variants to power an array of Bombardier, Embraer, and AVIC1 regional aircraft.

As GE develops CF34 variants, the company feeds these improvements into earlier models. As an example, since the first CF34-8 engine entered service on 70-passenger Bombardier jets in 2001, several CF34-8 technology improvements have been incorporated into existing models, and also led to new engine models, such as the CF34-8C5A2 to be introduced in 2009 for the CRJ1000. It will feature a new first-stage, high-pressure turbine nozzle and other enhancements for durability targeted to deliver up to 12% lower engine maintenance costs.

Also, GE is involved in technology development for a new centerline CF34 engine to power next-generation regional aircraft. This future engine will derive advanced materials and designs from the highly popular GEnx engine for the Boeing 787 and 747-8, as well as engine core durability advances being developed by GE for CFM International* to meet the same high-cycle operation of next-generation narrow-body aircraft. GE is developing and maturing technologies to meet these requirements for a time frame of 2015 and beyond.
Posted on Thursday, 08 May 2008 @ 05:27:15 EDT by admin

 
Related Links
General Aviation
· Business Category
· Search General Aviation
· News by admin


Most read story about General Aviation:
Diamond Aircraft in China


Article Rating
Average Score: 0
Votes: 0

Please take a second and vote for this article:

Excellent
Very Good
Good
Regular
Bad


Options

 Printer Friendly Printer Friendly


 
Associated Topics

AerospaceAirlinesBusiness
 

 
"GE Aviation Expects its CF34 engine to double in 10 years" | Login/Create an Account | 0 comments
The comments are owned by the poster. We aren't responsible for their content.
 

 
No Comments Allowed for Anonymous, please register
 



All logos and trademarks in this site are property of their respective owner. The comments are property of their posters, all the rest © 2005 by ComPilots.com.
You can syndicate our news using the file backend.php
Flight Simulator Downloads | Tisot.org | ComPilots.org | רשיון טייס | Life Varieties | טכנאי מחשביםעיצוב אתרים | קריות
PHP-Nuke Copyright © 2005 by Francisco Burzi. This is free software, and you may redistribute it under the GPL. PHP-Nuke comes with absolutely no warranty, for details, see the license.
F22Fighter.com Topsites List Visit Worldwide Topsites